Driveway |
|
|
Creation of new driveway using 60mm block paver setts
Client: Mae & Mike Collins
Completed: Nov 2013
Duration: 2 weeks
Works included:
- Removal of existing driveway
- Excavation and drainage
- Compacted Hardcore base
- Bradstone "Nidd Stone" pavers
- Haunchings and borders
|
|
|
|
|
|
|
|
|
Kitchen Extension |
|
|
Sympathetic Extension in the North York Moors
Client: Undisclosed
Completed: Oct 2013
Duration: 12 Weeks
Works included:
-
Site preperation, excavation, groundworks and foundations
-
Traditional cavity wall construction with stone to match existing building
-
Pantile roof
-
Conservation Rooflights
-
New flooring and internal joinery
|
|
|
|
|
|
|
|
|
Pantile Roof replacement |
|
|
Replace existing pantiled roof with new
Client: Undisclosed
Completed: Jul 2013
Duration: 2 weeks
Works included:
- Removal of existing pantiles, felt, battens, verges and ridge tiles
- Insulation upgraded to current standards
- Breathable membrane and battened
- Replacement Pantiles to match originals
- Verges and Ridge tiles
|
|
|
|
|
|
|
|
|
Sunroom, Substantial Internal remodelling |
|
|
Formation of new sun room extension, relocation of staircase, installation of bespoke kitchen, rebuilt chimneys, landscaping
Client: Monika & Tony Ward
Completed: Jun 2013
Duration: 6 Months
Works included:
- Site preperation, excavation, groundworks and foundations
- Construction of sunroom extension
- Extensive Internal remodelling
- Woodburner Installation
- New bespoke staircase
|
|
|
|
|
|
|
|
|
Traditional Yorkstone
Patio, Fencing and Field gates |
|
|
Formation of new patio
area using reclaimed York stone flags of varying thicknesses typically
3" deep
Erection of new fencing and field gates
Client: Mae & Mike Collins
Completed: Jul 2012
Duration: 3 weeks
Works included:
- Turf
removal and
sub-base excavation
- Laying
and Compacting 6" hardcore
- Random
laying York stone flags
- Post
and Rail fencing
- Installation
of 2 small field gates including ironmongery
|
|
|
|
|
|
Garage
Conversion |
|
|
Conversion of single
garage into a playroom
Client: Anna & Chris Frost
Completed: April 2012
Duration: 2 weeks
Works included:
- Construction
of brick
and block cavity wall in existing doorway
- Wall
and Floor
Insulation
- Screeding
- Plasterboarding
and
skimming
- Joinery
- Skirting,
Architraves and built-in cupboards
- Plumbing
new radiator
into existing heating circuit
- Coving
|
|
|
|
|
|
Victorian
Outbuilding |
|
|
Replacement roof and
remedial brickwork
Client: Jan & Medwin Bew
Completed: March 2012
Duration: 7 weeks
Works included:
- Removal
of existing
pantiles and careful handling to facilitate re-use
- Removal
of existing
roof timbers
- Sympathetic
demolition
of upper storey brickwork including cleaning bricks to facilitate
re-use
- On-site
fabrication
and installation of bespoke collar tied roof
- Replacement
brickwork
using clamp bricks reclaimed from the original building
- Insulation
of new
thermal elements
- Installation
of
reclaimed Pantiles and Ridge tiles
- Contoured
Fascia
boards, guttering and ventilation
|
|
|
|
|
|
Studio
Workshop |
|
|
Studio Workshop
conversion in the North York Moors.
Client: Lynne Glazzard
Completed: January 2012
Duration: 6 weeks
Works included:
- Removal of internal
loadbearing masonry wall
- Construction of
blockwork columns
- Installation of steel
beams (RSJ's)
- Studwork, Insulation
and Drylining
- Installation of new
base units and worktops
- Installation of
kitchenette with associated plumbing
|
|
|
|
|
|
Green
Oak Extension |
|
|
Construction of new
single storey extension which is sympathetic to the original building
Client: Maureen Moore
Completed: Summer 2011
Works included:
- Groundworks,
foundation design and installation
- Construction
of 2 new
walls in handmade bricks
- Fabrication
of Green
Oak roof with paired collar ties and inclusion of 2 conservation
rooflights
- Insulation
to floor,
walls and ceiling
- Installation
of
concertina sliding oak doorset
- Solid
Bamboo flooring
with electric underfloor heating
|
|
|
|
|
|
|
|
|
Stable
Block |
|
|
Construction of stable
block for 2 horses using 4x2 studwork, ply lining and softwood
featheredge cladding
Works included:
- Base
preparation,
levelling and concrete slab
- On
site fabrication of
frame and roof in timber
- Softwood
feather edged cladding
- Corrugated
sheet roofing
- Heavy
duty stable door
fabrication and installation
|
|