Ryedale Building Services Ryedale Building Services Ltd  
Home | Recent Projects | Contact Us | References
Project Portfolio
Driveway


Creation of new driveway using 60mm block paver setts



Client: Mae & Mike Collins
Completed: Nov 2013
Duration: 2 weeks
 

Works included:

  • Removal of existing driveway
  • Excavation and drainage
  • Compacted Hardcore base
  • Bradstone "Nidd Stone" pavers
  • Haunchings and borders


 
Kitchen Extension


Sympathetic Extension in the North York Moors



Client: Undisclosed
Completed: Oct 2013
Duration: 12 Weeks
 

Works included:

  • Site preperation, excavation, groundworks and foundations
  • Traditional cavity wall construction with stone to match existing building
  • Pantile roof
  • Conservation Rooflights
  • New flooring and internal joinery


 
Pantile Roof replacement


Replace existing pantiled roof with new



Client: Undisclosed
Completed: Jul 2013
Duration: 2 weeks
 

Works included:

  • Removal of existing pantiles, felt, battens, verges and ridge tiles
  • Insulation upgraded to current standards
  • Breathable membrane and battened
  • Replacement Pantiles to match originals
  • Verges and Ridge tiles


 
Sunroom, Substantial Internal remodelling


Formation of new sun room extension, relocation of staircase, installation of bespoke kitchen, rebuilt chimneys, landscaping



Client: Monika & Tony Ward
Completed: Jun 2013
Duration: 6 Months
 

Works included:

  • Site preperation, excavation, groundworks and foundations
  • Construction of sunroom extension
  • Extensive Internal remodelling
  • Woodburner Installation
  • New bespoke staircase


 
Traditional Yorkstone Patio, Fencing and Field gates


Formation of new patio area using reclaimed York stone flags of varying thicknesses typically 3" deep

Erection of new fencing and field gates



Client: Mae & Mike Collins
Completed: Jul 2012
Duration: 3 weeks
 

Works included:

  • Turf removal and sub-base excavation
  • Laying and Compacting 6" hardcore
  • Random laying York stone flags
  • Post and Rail fencing
  • Installation of 2 small field gates including ironmongery



Garage Conversion


Conversion of single garage into a playroom


Client: Anna & Chris Frost
Completed: April 2012
Duration: 2 weeks

Works included:

  • Construction of brick and block cavity wall in existing doorway
  • Wall and Floor Insulation
  • Screeding
  • Plasterboarding and skimming
  • Joinery - Skirting, Architraves and built-in cupboards
  • Plumbing new radiator into existing heating circuit
  • Coving




Victorian Outbuilding


Replacement roof and remedial brickwork


Client: Jan & Medwin Bew
Completed: March 2012
Duration: 7 weeks

Works included:

  • Removal of existing pantiles and careful handling to facilitate re-use
  • Removal of existing roof timbers
  • Sympathetic demolition of upper storey brickwork including cleaning bricks to facilitate re-use
  • On-site fabrication and installation of bespoke collar tied roof
  • Replacement brickwork using clamp bricks reclaimed from the original building
  • Insulation of new thermal elements
  • Installation of reclaimed Pantiles and Ridge tiles
  • Contoured Fascia boards, guttering and ventilation




Studio Workshop


Studio Workshop conversion in the North York Moors.


Client: Lynne Glazzard
Completed: January 2012
Duration: 6 weeks

Works included:

  • Removal of internal loadbearing masonry wall
  • Construction of blockwork columns
  • Installation of steel beams (RSJ's)
  • Studwork, Insulation and Drylining
  • Installation of new base units and worktops
  • Installation of kitchenette with associated plumbing




Green Oak Extension

Construction of new single storey extension which is sympathetic to the original building


Client: Maureen Moore
Completed: Summer 2011

Works included:

  • Groundworks, foundation design and installation
  • Construction of 2 new walls in handmade bricks
  • Fabrication of Green Oak roof with paired collar ties and inclusion of 2 conservation rooflights
  • Insulation to floor, walls and ceiling
  • Installation of concertina sliding oak doorset
  • Solid Bamboo flooring with electric underfloor heating


Stable Block
Construction of stable block for 2 horses using 4x2 studwork, ply lining and softwood featheredge cladding

Works included:

  • Base preparation, levelling and concrete slab
  • On site fabrication of frame and roof in timber
  • Softwood feather edged cladding
  • Corrugated sheet roofing
  • Heavy duty stable door fabrication and installation

4